15
jan
-
16
jan
Messe Dortmund, Germany
- Best Of Events 2025E-stand was given the challenge to build this double deck Fitbit stand for IFA Berlin 2017. In only 3 days this 400 m² construction was dressed and completed.
To create a clean and seamless finish, both on the inside and outside, the stand exists of 2000 m² of Panelskin™ panels. The result is impressive.
Project info | |
---|---|
Catégorie | Construction des stands |
Client | E-stand (UK) |
Correct | IFA Berlin 2017 |
Copyright © 2024 beMatrix. Tous droits réservés. Cookie policy - Politique de confidentialité - Conditions - Conditions de location